LINEAR STRUCTURES: ROADS, NETWORKS OF CYCLE PATHS, RIVER BANKS

 

 

DEVELOPMENT OF CYCLE PATH NETWORKS

  • Studies and project management for the development of greenways within the Communauté d’agglomération de Versailles Grand Parc (master plan 2012; project phase one 2014) – Contracting authority: Communauté d’agglomération de Versailles Grand Parc – Length: 70km
  • Study for the development of the parks way in Aulnay-sous-Bois and Sevran (pre-project conception studies 2012; project 2013) – Contracting authority: Conseil général 93 (DVD/SFP)
  • Project management study for the development of a cycle path along the tram-train line designated by “the Coquetiers” (study 2007) – Contracting authority: Sodédat 93
  • Drawing up of a schedule of recommendations for the development of cycle path networks in Seine-Saint-Denis (2003) – Contracting authority: Conseil général 93
  • Drawing up of a plan for cycle path networks in Seine-Saint-Denis (studies 2002-2003) – Contracting authority: Conseil général 93

 

RIVER BANK DEVELOPMENT

  • Banks of the Marne at Noisy-le-Grand (competition winner 2011; 2014 studies ongoing) – Contracting authority: Town of Noisy-le-Grand
  • Banks of the Marne at Noisiel and Torcy (competition winner 2007; completion 1st phase 2011; completion 2nd phase 2013) – Contracting authority: SAN de Marne-la-Vallée Val Maubuée
  • Banks of the Seine at Épinay-sur-Seine (completion 1st phase 2002; completion 2nd phase 2010) – Contracting authority: Conseil général 93, VNF
  • Feasibility studies for the development of the banks of the Seine (studies 2003-2004) – Contracting authority: Conseil général 92, VNF
  • Project for the urban recovery of the right bank of the Moselle at Thionville (definition study 2003) – Contracting authority: City of Thionville – AMA mandated architect

 

ROADS AND AVENUES

  • Redevelopment of the former RN3 and insertion of a dedicated public transport lane (TCSP) in Pantin, between the Porte de Pantin and the roundabout of the new road of Livry-Gargan (draft conception studies 2011; pre-project 2012) – Contracting authority: Conseil général 93
  • Redevelopment of the RD635 at Saint-Dizier (completion 2009) – Contracting authority: Commune de Saint-Dizier-Der-et-Perthois
  • Redevelopment of the RD306 (definition study 2002; redevelopment study 2007) – Contracting authority: Conseil général 77
  • General study relative to the infrastructure – development of the RD50 in view of the 2004 exhibition at Le Bourget (pre-project and project 2001) – Contracting authority: Conseil général 93
  • Landscape and urban study for the redevelopment of the RN4 in the communes of Ormesson-sur-Marne, Pontault-Combault, La Queue-en-Brie (study 1998) – Contracting authority: DDE 94 and DDE 77