La reproduction, même partielle, de toute image ou photo présentes sur ce site est interdite sans accord préalable.

List of references

Non-exhaustive list

 

LARGE LANDSCAPE STUDIES, URBAN STUDIES

 

DÉPARTEMENT PLANS, MASTER PLANS, PRELIMINARY PLANS, PLANS FOR LAND AREA COHERENCE (SCOT)

  • Diagnostic studies and master plan for the development of greenways within the Communauté d’agglomération de Versailles Grand Parc (studies 2012) – Contracting authority: Communauté d’agglomération de Versailles Grand Parc – Length: 70km
  • Feasibility study for the Hauts de Provins joint development zone (study 2006-2007) – Contracting authority: Communauté de communes du Provinois, AFTRP
  • Prospective study for the landscapes of the Drouais looking towards 2020 (study 2004) – Contracting authority: Communauté d’agglomération du Drouais
  • Drawing up a plan for a network of cycle paths in Seine-Saint-Denis (studies 2002-2003) – Contracting authority: Conseil général 93
  • Study on dissections in Seine-Saint-Denis (study 2002) – Contracting authority: Conseil général 93
  • Study of the landscapes of Val-de-Marne (studies 2002) – Contracting authority: Conseil général 94

 

LARGE LAND AREAS, NATURAL SPACES, AGRICULTURAL SPACES

  • Study of the land formerly occupied by the A103 highway in the communes of Rosny-sous-Bois, Villemomble, Neuilly-Plaisance and Neuilly-sur-Marne (study 2013-2014) – Contracting authority: AFTRP
  • Study and conception of a landscape framework in the Sausset valley in Tremblay-en-France and Villepinte (study 2013) – Contracting authority: AFTRP, Communauté d’agglomération Terres de France
  • Study for the creation of an agricultural park on the fringes of the Sycomore eco-district in the communes of Bussy-Saint-Georges and Jossigny (study 2011) – Contracting authority: EPAMARNE – Surface area: 50ha
  • Landscape study for the park of Mont-Griffard (study 2007) – Contracting authority: Val de France, Communauté de communes du Val-d’Oise (Sarcelles, Villiers-le-Bel, Écouen)
  • Study on the urban border of Lilas park in Vitry-sur-Seine (study and draft plan 2005) – Contracting authority: Conseil général 94
  • Charter for the public spaces of the university and urban project of Villetaneuse (study 2004) – Contracting authority: Plaine Commune – C. Devillers architect
  • Open-air and leisure park of Romainville (study 2003) – Contracting authority: Communes of Romainville, Les Lilas, Noisy-le-Sec, Pantin – AUC mandated urban planner
  • Study for an agricultural discovery path in Val-de-Marne (1998) – Contracting authority: Conseil général 94 and SAFER
  • Environmental study of the Nozay plateau and Villejust over 100ha and development of a quarry site over 40ha (1998); study of the whole of the agricultural plateau (including an environmentally sensitive site) and the drawing up of different scenarios for the development of the quarries – Contracting authority: Département de l’Essonne
  • Redevelopment of the highway site of the Bièvre valley in the communes of Igny, Verrières-le-Buisson and Massy (studies 1996, 1997) – Contracting authority: SIAVB
  • Greenway connecting the communes of Epinay-sur-Orge, Villiers-sur-Orge and Ballainvilliers on an agricultural site of 400ha (competition winner 1992; pre-project planning 1993; studies 1995); studies on the future of the agricultural land area, the urban extension of the communes, the creation of a natural park over several communes – Contracting authority: the communes, Conseil général 91, Conseil régional

 

URBAN STUDIES, RAIL TRANSPORT HUBS

 

  • Studies for an urban project in the Dulong sector in Floirac (studies 2013-2014) – Contracting authority: Communauté urbaine de Bordeaux – O’Zone Architectures mandated architects
  • Multi-tender framework agreement for the development of the station district in Lorient (competition 2011; study 2013) – Contracting authority: CAP Lorient Agglomération – Florence Mercier Paysagiste mandated landscape architect – O’Zone Architectures
  • Pre-operational studies for the public spaces of the Landy-Pleyel joint development zone in Saint-Denis – landscape developments of the Nord extension (studies 2006) – Contracting authority: Plaine Commune
  • Urban and planning programme study for an ecopark in the Entrepôts zone in lle-Saint-Denis (study 2007) – Contracting authority: Plaine Commune – B. Philippon mandated architect
  • Studies on Papeete seafront (urban project, park and tram line 2005-2006) – Contracting authority: EGT – COTEBA BET, AMA and J. Chicou architects
  • Study on the plant palette of Tahiti with a view of the planting of Papeete seafront (2005) – Contracting authority: EGT
  • Study of the site of the Fives-Cail-Bailcock warehouses in Lille (definition study 2005) – Contracting authority: Sorelli – C. Devillers mandated urban planner
  • Study for the transformation of the Nord districts in Amiens (study 2001) – Contracting authority: City of Amiens
  • Study for the transformation of the Gare du Nord in Amiens (study 2000) – Contracting authority: City of Amiens
  • Study of the western quarter of the École polytechnique – Saclay plateau (study 2000) – Contracting authority: District of Saclay plateau – A. Amar urban planner